Elnur Mattira MAS15 Electric System Boiler Installation – Bartech Engineering HQ

Installation of a Elnur Mattira MAS15 Electric System Boiler and 8 radiators into a our new HQ operations department

Bartech Engineering Ltd t/a Dublin Plumbing Services

7 Slaney Court,

Slaney Rd,

Dublin Ind Est,

Dublin 11

Hot Water Upgrade Project – Luigi Malones Restaurant

Hot Water Upgrade Project:

We removed an old gas water heater as the newer model of the gas heater was much bigger and wouldn’t fit.

So, we installed an Elnur Gabarron MAS15 Electric system Boiler heating a 250lt stainless steel hot water cylinder.

 

Luigi Malones restaurant

Temple Bar

Dublin 1

Clontarf GAA Club – Central Heating and Instant Hot Water Plant Upgrade

Clontarf GAA Club:

Central Heating and Instant Hot Water plant upgrade to High Efficiency boilers

The upgrade will give the club a gas saving of approx 30-50%

LAYTOWN CHURCH HEATING UPGRADE PROJECT

Installation of  2 x 90kw Gas Powrmatic Warm Air Cabinet Heaters

We were very excited to be awarded this mechanical  project by Laytown Church as been a protected Structure we had to overcome some delicate structural  issues with the installation of the new equipment.