Elnur Mattira MAS15 Electric System Boiler Installation – Bartech Engineering HQ
Installation of a Elnur Mattira MAS15 Electric System Boiler and 8 radiators into a our new HQ operations department
Bartech Engineering Ltd t/a Dublin Plumbing Services
7 Slaney Court,
Slaney Rd,
Dublin Ind Est,
Dublin 11
Hot Water Upgrade Project – Luigi Malones Restaurant
Hot Water Upgrade Project:
We removed an old gas water heater as the newer model of the gas heater was much bigger and wouldn’t fit.
So, we installed an Elnur Gabarron MAS15 Electric system Boiler heating a 250lt stainless steel hot water cylinder.
Luigi Malones restaurant
Temple Bar
Dublin 1
Clontarf GAA Club – Central Heating and Instant Hot Water Plant Upgrade
Clontarf GAA Club:
Central Heating and Instant Hot Water plant upgrade to High Efficiency boilers
The upgrade will give the club a gas saving of approx 30-50%
LAYTOWN CHURCH HEATING UPGRADE PROJECT
Installation of 2 x 90kw Gas Powrmatic Warm Air Cabinet Heaters
We were very excited to be awarded this mechanical project by Laytown Church as been a protected Structure we had to overcome some delicate structural issues with the installation of the new equipment.