Elnur Gabarron Mattira MAS15 Electric System Boiler Installation
Our first installation project of an Elnur Gabarron Mattira MAS15 Electric System Boiler.
The apartment had a gas boiler with approx. flue length of 10m running through the ceiling to the out side, leaks from the flue joints with no access meant the flue was unsafe, it would have been a major job to replace the gas boiler with a high efficiency one because of the location of the flue.
The solution was an electric system boiler – fully modulating, very efficient and silent
We have the distribution rights for ROI
Please contact us for more information – hugh@dublinplumbingservices.ie – 01 8330033
Project Address:
Apartment, The Stockyard
The Steelworks
Foley Street
Dublin 1